Section I — Long-Term Philosophy

Principle 1

People need purpose to find motivation and establish goals.

Section II — The Right Process Will Produce the Right Results[edit]

Principle 2

Work processes are redesigned to eliminate waste (muda) through the process of continuous improvement — kaizen. The seven types of muda are:

  1. Overproduction
  2. Waiting (time on hand)
  3. Unnecessary transport or conveyance
  4. Overprocessing or incorrect processing
  5. Excess inventory
  6. Motion
  7. Defects

Principle 3

A method where a process signals its predecessor that more material is needed. The pull system produces only the required material after the subsequent operation signals a need for it. This process is necessary to reduce overproduction.

Principle 4