Purpose:
Record project plan, basis of Bioreactor GANNT
Algae Bioreactor Development
Project Overview
This framework outlines a systematic approach for a solo engineer to develop a complete algae bioreactor system with the following components:
- Bioreactor core with growth medium
- Sensor sampling array
- Automated reservoir and harvesting system
- Extraction chamber
- Fractionation column
End Deliverable: 10 grams of bio-crude separated into its component fractions
Development Framework
Phase 1: System Decomposition & Risk Prioritization (Weeks 1-2)
Module Breakdown
- Bioreactor Core
- Growth chamber design
- Lighting system
- Gas exchange mechanism
- Temperature control system
- Sensor Array
- pH monitoring
- Dissolved oxygen
- Temperature sensors
- Optical density/biomass measurement
- Data acquisition system
- Reservoir & Harvesting
- Nutrient delivery system
- Harvesting mechanism
- Filtration/separation approach
- Biomass concentration
- Pyrolysis/Methanolysis Chamber
- Thermal control system
- Reaction vessel design
- Catalyst selection (if applicable)
- Gas handling and safety mechanisms
- Fractionation Column
- Column design and packing
- Temperature gradient control
- Collection system for fractions
- Analytical verification approach