<aside>
Your words help me improve
</aside>
<aside> <img src="/icons/package_blue.svg" alt="/icons/package_blue.svg" width="40px" />
Feature: Plate Joy App Personalized Meal Plans Feature
</aside>
<aside> <img src="/icons/calendar-month_green.svg" alt="/icons/calendar-month_green.svg" width="40px" />
Last Updated: 22nd September
</aside>
<aside> <img src="/icons/user-circle_pink.svg" alt="/icons/user-circle_pink.svg" width="40px" />
Prepared By: Similoluwa Alao
</aside>
<aside> <img src="/icons/list-indent_purple.svg" alt="/icons/list-indent_purple.svg" width="40px" />
Version: 2. 0. 1
</aside>
<aside> <img src="/icons/calendar-month_blue.svg" alt="/icons/calendar-month_blue.svg" width="40px" />
Date Created: 16th September
</aside>
Young people living with various health conditions often lack access to meal options specifically tailored to their dietary needs. This gap makes it difficult for them to manage their health effectively, as generic meal plans and food options do not adequately address the unique nutritional requirements associated with their conditions.
What are we trying to build and why?
To reduce health costs and make life better for everyone
Who we are building this for
•https://simijoan27.atlassian.net/jira/software/projects/PMPFT/boards/6/backlog?epics=visible&issueParent=0%2C10010%2C10011&atlOrigin=eyJpIjoiZjgxNTIxYzVhZTIzNDRhMDlkYjk5YTc1YjJjZGRhNjIiLCJwIjoiaiJ9
How will we measure success?
| 📈Metric | 🔰Type | #️⃣Number | 〽️Direction |
|---|---|---|---|
| Completed Transactions per payer per person per month | Revenue | 5% | Increase |
| Checkout CSAT | Retention | 5% | Increase |
| Time spent waiting | Retention | 15% | Decrease |
What exactly needs to be built?
Minimum Viable Product

https://balsamiq.cloud/sjyw6cn/p5yaayl/r7283

https://www.canva.com/design/DAGxAT5GkSU/KGpFw09wEFoVUTUSfArLGA/view?utm_content=DAGxAT5GkSU&utm_campaign=designshare&utm_medium=link2&utm_source=uniquelinks&utlId=h9deb212870
What’s in scope and what’s out?
In Scope:
Out of Scope:
For the engineering team
What needs to happen before this can be built?
Key dates and phases
| Milestone | Date | Notes |
|---|---|---|
| Kickoff | 14th September 2025 | |
| Design Complete | 6th October 2025 | |
| Development Start | 7th October 2025 | |
| Beta Launch | 30th October 2025 | |
| Public Launch | 15th November 2025 |