Current Calendar:
12/17/2025: Revised Giraffael 2. Reverted it back with remote server deployment (EC2 at AWS), and recovered its original name “Giraffael”.
12/18/2025 - 12/19/2025:
- Added a record for the elastic IP address of the deployed EC2 instance with domain “giraffael.com” on Squarespace.
- Revising the project structures. Updated things related to Docker and Redis. Updated the requirements.txt (previously known as requirements.sh).
12/20/2025 - 1/1/2026: Added a new thought process to the project page on Notion.
1/2/2026: Set up docker compose file for Giraffael and successfully build with server.Dockerfile.
1/3/2026 - 1/8/2026:
- Moved main logics from Giraffael 2 over to Giraffael (i.e. server side separated routers and services).
1/9/2026 - 1/19/2026:
- Working on Giraffael3 (chat app w/ Socket.IO).
To-Do List