<aside> 💡 The public wiki is public to anyone (it can be accessed via the website).

</aside>

Current Objective

To collect cost information for the existing power infrastructure, the cost of a potential outage (risk) as well as the investment costs for a battery-based backup power system and assemble it into a first price estimate for a kWh with guaranteed availability (e.g. 99.95% or 99.999%)

SDIA Staff


Meeting Notes

Deliverables

Reference Material