Run Context
Live Notion connector was available. The connector SQL endpoint rejected basic data-source queries, so the run used targeted Notion search and exact page fetches, plus direct Notion REST status counting using the same Status = Needs Follow-up filter. This is not fallback-derived.
Live backlog count: 292 Needs Follow-up at 2026-06-02 11:29 UTC from data_sources/13d5d9db-4588-41bc-afa9-45ce9e23e56c/query. Today's SAIL KB Daily Pulse reported 289 earlier at 11:07 UTC. Use 292 because it is the later live count.
Top Pressing Items
- Brand orange drift is the highest website follow-up. Reason: the June 2 weekly sweep found 113 published pages with genuine orange-fill blocks, 148 high-severity fill blocks, 30 banned gradient fills, and 511
sa-stat-card class occurrences. Evidence: Weekly Orange-BG / Brand-Drift Sweep, 2026-06-02. Safest next action: stage a wp-content-deployer draft remediation for the 113 pages and keep go-live approval separate.
- Google Ads attribution repair still needs reconciliation. Reason: June 1 approved actions paused the Spanish broad keyword and attempted 14 negatives, but today's live GAQL readback confirms the Spanish keyword is paused and still shows 0 of the 14 target negatives plus 0 upload-conversion rows. Evidence: Google Ads attribution repair run, 2026-06-01, NotFair
listConnectedAccounts, summarizeAccountSetup, and read-only runScript at 2026-06-02 11:30 UTC. Safest next action: reconcile through direct Google Ads UI/API or NotFair support before relying on those negatives as live.
- Daily briefing items are genuinely time-sensitive but separate from KB hygiene. Reason: Sam's endoscopy/colonoscopy blocks 9:00 AM to 5:00 PM ET and conflicts with three meetings, while action emails include office-vehicle complaint, IRS abatement, ABA renewal, kickball approvals, and WDRB media. Evidence: Daily Briefing 2026-06-02. Safest next action: keep these as briefing follow-ups, not Notion drift defects.
- KB pulse helper drift is real. Reason: today's pulse says helper scripts were missing and ran through inline REST fallback; local check found
build_report.py but not notion_paged_query.py or kb_live_backlog.py in Skills/sail-kb-daily-pulse. Evidence: SAIL KB Daily Pulse - 2026-06-02 and local skill folder check. Safest next action: regenerate the missing helpers and update the skill so future counts do not depend on inline fallback code.
- Lead delivery looks better than yesterday's Junk concern, but notification durability remains unresolved. Reason: Outlook search showed recent website lead emails from June 1, including #98 Dennis McGowan and QA/test leads; direct Junk folder listing did not show those website lead subjects, but prior Teams workflow suspension remains a separate alerting risk. Safest next action: verify Teams workflow health before declaring lead alerting clean.
- Nick Agentforce should stay closed. Reason: the canonical June 1 closure page is Complete and live Salesforce metadata still lists
Nick_Attorney_Hub_Agent; older timeout or missing-Bot pages are historical. Evidence: Nick Attorney Hub Agentforce deployed and verified, 2026-06-01, plus sf org list metadata --metadata-type Bot --target-org LITIFY_ORG. Safest next action: treat future Nick work as enhancement unless a newer live check contradicts it.
Likely Forgotten Or Unfinished
Website and Branding
- Status: Needs Follow-up. Owner not visible. The orange-fill drift audit is complete, but remediation is approval-gated and not live. It looks unfinished because it found a large, concrete set of affected pages and no draft remediation has been staged yet.
- Status: Needs Follow-up. Owner not visible. Deprecated template classes, especially
sa-stat-card, need a design/template migration rather than a regex swap. It looks unfinished because the audit separated it from the color-swap remediation.
Google Ads and Attribution
- Status: Needs Follow-up. Owner not visible. Spanish campaign spent $158.02 on June 1 with 0 conversions; Lexington spent $81.55 with 0 conversions. This is lower-confidence than the 7-day evidence, but it supports monitoring. It looks unfinished because approved negative writes are not visible in GAQL readback.
- Status: Needs Follow-up. Owner not visible. Google Ads upload conversions for
Litify - Signed Retainer (Web Form) and Litify - Converted Intake (Web Form) still returned 0 rows for May 3 through June 1. It looks unfinished because the Sheet sync has not surfaced in reporting.
- Status: Needs Follow-up. Owner not visible. CallRail Google Ads OAuth remains separate from CallRail API health. It looks unfinished because recent pages verified API reachability but not integration reauthorization.
Operations
- Status: Needs Follow-up. Owner not visible. Daily Pulse helper scripts are missing, and the report was 381 lines. It looks unfinished because the run completed only through inline REST fallback and still has two QA findings open.